Powder Project Logo

History Rock - Upper Powder Field

 4.0 (1)
Trail Mapped Wrong?

Length

0.2 Miles 0.2 Kilometers


Ski Line

Elevation

0' 0 m

Ascent

-223' -68 m

Descent

28%

Avg Slope (16°)

30%

Max Slope (17°)

8,412' 2,564 m

High

8,189' 2,496 m

Low

Conditions


Unknown

Getting forecast...

Avalanche risk for May 2, 2018: Moderate

Heightened avalanche conditions on specific terrain features. Evaluate snow and terrain carefully; identify features of concern. Natural avalanches unlikely; human-triggered avalanches possible.

Full forecast for GNFAC: Northern Gallatin Range — Brought to you by Gallatin NF Avalanche Center

Avy tweets from @AvalancheGuys

Lap-able for days.

samh Haraldson

Overview

Hyalite Road is closed from approximately Apr. 15 to May 15.
Type: Backcountry or Sidecountry

Description [Suggest Changes]

This gorgeous powder field is short, but sweet. The perfect angle to be safe during moderate + avalanche conditions but still steep enough to get your stoke heightened.

Drop in. Transition. Skin up. Repeat. This section tracks out relatively quick on a pow day but there's usually something left to shred even later in the day.

Contacts

You & This Featured Ski Line


Rate Quality


   Clear Rating

Rate Difficulty

Share This Ski Line

Your Check-Ins

Check-Ins

Mar 27, 2016
Chang Liu

Trail Ratings

  4.0 from 1 vote

#286

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Rankings

#25

in Montana

#286

Overall
1 Views Last Month
434 Since Mar 12, 2015
Easy/Intermediate Easy/Intermediate

33%
0%
67%
0%
0%
0%

0 Comments

Powder Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Ski